Work on production line of Boeing 737 Max ‘not adequately funded’ bbc.com
A former Boeing engineer has told the BBC's Panorama programme that work on the production line of the 737 Max plane was not adequately funded.
voters
Report Story
A former Boeing engineer has told the BBC's Panorama programme that work on the production line of the 737 Max plane was not adequately funded.
Leave Your Comment